![]() |
![]() |
![]() |
|
|
|
||||||
![]() |
![]() |
||||||||
Leonid A. BUSKO
Head of the pilot plant
|
PILOT PLANT OF POWDER METALLURGY INSTITUTEThe total employment of the pilot plant consists of 6 engineers and 26 workers of main professions. The production space makes 2730 m2. The volume of production in 2004 was 112 tons of products from powders of iron, non-ferrous metals and composite materials The pilot plant
organization structure includes 5 areas:
|
||
|
AREA OF CHARGE PREPARATION
This part of pilot plant occupies 216 m2 and has the next equipment
|
|
|
|
|
AREA OF SINTERING occupies 745m2 and has the next equipment
|
|
|
|
|
AREA OF PRESSES occupies 847m2 and has the next equipment
|
|
|
|
|
MECHANIC AREA occupies 821 m2 and has the next equipment:
|
|
|
THERMAL AREA has two furnaces;
SNO 4,8.2/, 5/13 and SNO 3,6.2 -10 and equipment of laboratories as follows:
|
|
|
|
|
Structural and tribotechnical products on the base of iron,
copper, graphite, tin powders being produced by the pilot plant
|
|
|
Main types of the pilot plant production:
|
|